Define the finished-lot decision
Start with the unresolved question: does the available production lot match the requirements you have agreed, within the inspection scope? Record the purchase-order reference, product and variant breakdown, quantities and actual location of the goods. Identify any part of the order at another site or still being completed. A booking for one location should not silently stand for an order spread across several locations.
Pro QC’s Vietnam pre-shipment inspection description includes comparison with approved samples, specifications, purchase requirements and packaging instructions. This is a provider’s published service scope, not a quotation or confirmation that a particular product or date can be accommodated.
If the question concerns equipment, production controls or the factory’s systems, discuss a different assessment: SGS’s technical-audit scope includes those areas. Use the supplier evidence guide to keep identity checks and specialist assessments separate. This briefing guide concerns ordinary consumer goods; regulated or safety-critical products require product-specific expertise beyond this checklist.
Ask whether the question needs earlier observation
Before relying on a finished-lot inspection, identify any question about work that may be concealed by later assembly or packing. Ask the qualified provider when that feature or operation can be observed, which goods must be available and what references it needs. Record anything a final inspection cannot answer.
SGS describes during-production checking as a separate stage intended to identify issues before the consignment is completed. Its published service conditions are an example, not a universal production-percentage trigger.
Add the agreed observation point to the existing production timeline, with the factory’s access confirmation and the reviewer’s decision. Keep the resulting evidence limited to the goods and stage examined; it does not replace the finished-lot questions or authorize release of the order.
Give the inspector one current reference pack
Collect the requirements the buyer has actually approved. Label the files consistently and ask the provider to confirm it can use them. A photograph without an identifiable revision or a chat message saying “same as before” leaves the comparison basis unclear.
- Order: purchase-order reference, SKU and variant list, ordered quantities and units.
- Product: current specification and drawings, revision dates, approved differences and the features each reference covers.
- Physical sample: identity, location, custodian and how the inspector can access it. State when a photo is the only available reference.
- Packing: current artwork, item count, packing configuration and carton-marking instructions.
- Open decisions: missing criteria, conflicting files, proposed substitutions and reviews that have not been completed.
Use the sample approval record to establish the master reference before this handoff. Do not ask the inspector to choose between contradictory buyer instructions. Resolve the conflict or have the provider identify what must remain outside the agreed evaluation.
Agree checks, evidence and exclusions
Turn each concern into a question the provider can scope. “Check quality” does not specify what should be compared, what evidence is needed or how an unresolved result will be handled. The record below is an original briefing framework, not a technical inspection standard.
| Buyer question | Reference to supply | Confirmation to request |
|---|---|---|
| Which variants and quantities are present? | Order lines, variant identifiers and packing list | Goods covered, counting approach and inaccessible quantities |
| Does the observed appearance match the approved reference? | Identified physical reference and buyer-approved appearance criteria | Comparison conditions, evidence to report and ambiguous criteria |
| Can a specified dimension or function be checked? | Current specification and agreed requirement | Method, equipment, technical competence and any separately needed testing |
| Is the intended retail unit packed correctly? | Product and packaging revisions, contents and packing instructions | Configuration reviewed, checks included and protection questions left open |
Ask the qualified provider to propose the appropriate sampling and inspection method, and have the responsible buyer and specialists agree the acceptance criteria. Record how defects will be described and which references govern disputed appearance. This guide does not prescribe sample counts, AQL values, defect limits or performance tests. If a question requires laboratory testing or engineering judgment, arrange that scope separately rather than assuming an on-site check includes it.
Connect selected samples to laboratory receipt
If the agreed work includes sending production samples to a laboratory, identify who selects them and preserve the connection from the source lot to laboratory receipt. A matching product name on the report leaves that handoff unanswered.
Add one selection-to-laboratory row to the inspection record:
- Selection: selector and organization; date and actual site; source lot; goods available and inaccessible; provider-agreed selection method.
- Identification: inspection reference, sample IDs and product revision, quantity selected, and permitted photo references.
- Dispatch and receipt: sender, dispatch date and tracking reference; seal identifier if used; laboratory receipt reference, quantity and any identity, package or seal discrepancy.
Record the actual selector. A supplier-selected sample remains supplier-selected even when an outside laboratory tests it. If a lot, handoff or receipt is uncertain, leave that link open and ask the provider what clarification or repeat work is needed before relying on the sample's stated origin. A seal alone does not establish what the sample represents or guarantee the whole lot.
Vietnam Inspections describes its own pickup service as selecting production samples, identifying the order, sealing, photographing and dispatching them. That self-description is a scoped example, not independent verification of its service, a booking or a sampling standard.
Use the sample record for test consumption and the usable reference left afterward. Use the supplier evidence guide for report identity, scope and authenticity; the handoff row does not decide technical applicability.
Confirm the Vietnam site and goods are ready for the agreed work
Send the actual inspection address and site contact, not only the supplier’s sales-office details. Ask the factory and provider to acknowledge the location, proposed date and time zone, available variants, packing status and access to the goods and references. If you are coordinating from overseas, identify who at the site can answer an access question while the buyer’s decision owner is unavailable.
Pro QC describes supplier coordination and production-status confirmation as part of its service. Obtain the selected provider’s readiness requirements for this booking; do not turn one provider’s published percentage or timetable into a rule for every inspection.
- Who confirms which goods will be accessible, and when will that confirmation be updated?
- Can the inspector reach the agreed goods, open packaging where needed and use the approved reference?
- Who supplies any required equipment or assistance, as agreed with the provider?
- What happens if a variant, document or required reference is unavailable?
- Who may approve a scope change or a revised date, and how will any revised service terms be confirmed?
Keep factory readiness separate from collection arrangements. Give the appointed logistics contact any resulting change to the plan; an inspection booking is not confirmation of transport availability.
Assign repacking before the inspection
Before booking, agree who restores opened packs, replaces damaged packing materials and confirms the affected cartons are ready afterward. Include how the factory will account for pieces removed for testing or retained as references; do not silently replace them with unapproved goods.
QIMA's Conditions of Service, sections 7.1.6 and 7.2.2, assign post-inspection repacking to the supplier and distinguish the inspection report from shipment evidence. Confirm the actual factory and provider arrangements for this booking rather than treating QIMA's terms as an industry-wide allocation.
Add a repacking follow-through to the inspection record: affected carton and sample IDs; named repacking owner; approved packing revision; removed-unit disposition reference; missing or damaged pack materials; completion date and evidence; and unresolved buyer decision. Ask the responsible person to acknowledge the completed configuration, including any remaining shortage.
If contents or labels change, update the existing carton-content and marking record. Keep consumed or retained samples in the sample allocation record, and product correction in the production issue record. Repacked cartons do not by themselves close an inspection finding or authorize shipment.
Example: a current product with an old packing file
Fictional teaching example: a buyer orders decorative desk organizers in two colors. The approved product file is revision B, but the supplier’s proposed inspection pack contains a revision A insert drawing. Only one color is reported ready. No real supplier, inspection result or recommended order quantity is represented.
- Identify the uncertainty. Ask whether the insert changed with product revision B and which packing reference the buyer approved. Record the second color as unavailable, rather than describing the whole order as ready.
- Resolve the reference. The buyer confirms the correct insert file or requests the necessary fit review. The inspector does not invent the intended clearance or decide that revision A is equivalent.
- Reconfirm the inspection scope. Ask the provider whether the agreed work can proceed on the available scope and how the missing variant will be reported. Any changed scope needs an explicit decision.
- Preserve the limit. Findings on the inspected color cannot be recorded as observations of the absent color. Keep the remaining question and its next review visible.
Keep the report and the buyer’s decision connected
Before the visit, agree the reporting arrangements and who receives urgent findings. Ask the report to identify the inspected goods, references used, observations, supporting images or measurements and anything not checked. Separate the provider’s recommendation from the buyer’s decision under the order’s agreed arrangements.
For each unresolved finding, record: report reference; affected goods and known limits; proposed next action; responsible contact; evidence needed for the next review; and buyer decision owner. Do not close the issue merely because a supplier says it has been corrected. Use the production issue and closure record to carry the finding forward without maintaining a second conflicting log.
The completed brief should make four things easy to find: what is being examined, what it is being compared with, what remains outside the work and who decides next. Keep any shipment or payment decision within the authority and terms already agreed for the order; this checklist does not create a release rule.
If loading observation is needed after the finished-lot review, prepare a separate container-loading supervision brief rather than extending the inspection result to work it did not cover.
Sources and scope
- Pro QC: Pre-Shipment Inspections in Vietnam — published provider scope and coordination description, not a supplier endorsement or confirmed booking.
- SGS: Vendor Assessment and Technical Audit — the separate scope of systems and capability assessment.
The briefing questions and fictional example are editorial planning tools. They do not establish product conformity or replace an agreed specialist inspection plan.